FSP have recently supplied 'made to measure' duct covers to Laing O'Rourke. Fabweld worked closely with Richard Fairhurst (Senior Engineer) to adapt a design which suited a pre-cast rebate. The covers have been installed in the new maintenance shed for the Manchester metro link.
